Continuation of cooperation with Hemofarm STADA
Continuation of cooperation with Hemofarm STADA – signing a contract on long-term consulting in the field of qualifications/validation of the process equipment and systems.
Sharing news is important because it informs our community and partners on our stance in the business world, and in response we act and make choices based on how we perceive the world to be. There are many aspects of news that make it significant, but one that is often overlooked is that news makes us feel connected with the public.
As we want our partners to get acquainted with us, it is important for us to share information regarding the latest developments in FormaPharm.
Continuation of cooperation with Hemofarm STADA – signing a contract on long-term consulting in the field of qualifications/validation of the process equipment and systems.
Under the Contract signed between „Hemomont“ d.o.o. Podgorica and „FormaPharm Engineering Group“ d.o.o. Podgorica (December 2014) on the subject of „Preparation of the Final Design and Execution of Reconstruction Works on the Existent Facilities of the Hemomont Complex, with a view to constructing a new department for sterile nasal spray production and a ”mobile racking” […]
The new structure, the „Hemofarm Quality“ building, is located within the complex of Hemofarm a.d., Vršac. The building dimensions are ≈ 90 m length and ≈ 25 m width. The number of floors is Gr. floor + I + II floor, ≈net area around 6,500 m2. The ground floor is planned to accommodate the Quality […]
15.06.2015. – 19.06.2015. Visit of FPEG representatives to the international fair – „ACHEMA 2015“, the World Forum, and the leading show for the process industries which was held in Frankfurt am Main. The fair which has in the past years proven to be the most important fair for manufacturers of equipment for process industries, chemical […]
On June 5, 2015 the Russian company NEARMEDIC opened a pharmaceutical plant in the Kaluzhskaya oblast designed to provide a range of key medicines to the domestic market. The facility opening ceremony was attended by the Minister of Industry and Trade of the Russian Federation, Denis Manturov; the Governor of the Kaluzhskaya oblast, Anatoly Artamonov; […]
In the period December 2014 – May 2015 investment maintenance works were executed on the existing building built in 1931 (a major reconstruction in 1996), thus improving the conditions of its use during exploitation, expanding the building’s usability and preventing further decay. All the works were executed within the outline and volume of the building […]
31.03.2015. – 01.04.2015. Successfully completed training of Validation Service representatives on the subject of validation of computerized systems, risk analysis and compatibility of computerized systems with the requirements of pharmaceutical regulations.
On 04 December 2014 the Contract was executed for the preparation of design-technical documentation for the „Palladio-Obninsk“ Factory for the Production of Packaging for Pharmaceutical and Cosmetic Industries, Kaluga Region, the city of Obninsk, industry area, plot area 2 ha, total facility area 10987.50 m2, the construction has been planned to be executed in three […]